688

seats

28

classrooms

$8.45 million

to complete

Historic Project

Aspire Alexander Twilight College Prep and Aspire Alexander Twilight Secondary

This project provides a school facility for Aspire Public Schools that accommodates a total of 512 students in grades K-8. School was opened on September 1, 2009. The property was originally designed and built as a 600 seat facility by the Institute of the Blessed Virgin Mary as a catholic high school for young women. The facility encompasses approximately 64,000 square feet on 9.1 acres. It encompasses a total of 28 classrooms, a full-size gymnasium, library, performing arts center and soccer field. The facility was constructed in three major phases: Phase I was built in 1955 and included classrooms, cafeteria/meeting hall and gymnasium. In 1980 Phase II was constructed to include a 5,000 square feet library and a six classroom building. Phase III was constructed in 1998 and included a new administration wing with 3 state of the art science rooms and a performing arts center for music, dance and theater programs.

The facility opened with approximately 400 students with full enrollment to reach 688.

You are here: What We Do » Past Projects » Aspire Alexander Twilight College Prep and Aspire Alexander Twilight Secondary

Type:

K-8

Site:

2360 El Camino Avenue, Sacramento, CA 95821

Neighborhood:

Ben Ali

Architects:

K2A Architecture

School Opening:

September 2009

Site Acres:

9.1